Reservoir Operations & Federal Water Litigation · Corps of Engineers and Bureau of Reclamation
Congress authorizes construction of a project once. How it is operated can be revisited.
Water control manuals, operating guidelines, drought plans, and deviations determine how much water is stored, when it is released, and who bears the risk of shortage. Those operating documents, not the physical structure, determine water supplies and determine what a community can count on.
Why operations are the battleground
Bringing Federal infrastructure into the 21st century.
Most federal dams were authorized between the 1930s and the 1970s, for the purposes and populations of that era. Very few new ones are coming. What has changed instead is everything around them: demand, hydrology, species listings, energy markets, and the political weight of the interests each purpose created.
The question thus becomes how projects will be operated to meet changing needs and conditions: will the federal agency hold more, release less, shift the timing, revisit the balance among authorized purposes? These decisions are made in revised operating documents, and everyone who currently benefits from the existing balance has standing, resources, and a reason to oppose changes benefiting the purposes they favor.
These disputes are unusually durable. The Apalachicola–Chattahoochee–Flint litigation ran for more than three decades. Colorado River operating rules adopted as an interim measure in 2007 governed nearly twenty years and set the terms of every negotiation that followed. Operating decisions look procedural when they are made and turn out to be structural.
Concrete lasts a century. Operating rules get rewritten — and each rewrite is a chance to gain or lose supply.
The hydropower example
A twentieth-century purpose with twenty-first-century leverage.
There are many ways to generate electricity. There is no way to manufacture water for drinking or irrigation.
The hydropower purpose arose for a reason that made sense at the time. When many federal projects and reservoir systems were authorized, large parts of the country had no electricity at all, and rural electrification was a national priority. That purpose was real, and it was accomplished.
The grid has changed beyond recognition since. In some systems hydropower is still genuinely essential — the Columbia most obviously, where the generation is enormous and not readily replaced. In many others it is a modest contribution to a grid with abundant alternatives, and the operating regime it justifies is worth far more to its beneficiaries than the power itself.
That is why power interests are, in practice, the most persistent opposition a water supply project encounters. They are organized, well funded, and permanent. Preference customers, power marketing administrations, and utilities holding long-term contracts have a direct financial stake in the existing regime and participate actively in proceedings that might alter it.
- Manual updates. Foregone generation is offered as the reason the operating regime cannot change.
- Reallocation studies. Lost power benefits become the argument that a change would seriously affect an authorized purpose — the finding that moves a decision out of the agency's hands and into Congress's.
- Deviations and pilots. Even temporary storage draws objection, on the theory that any departure sets a precedent.
- Litigation. Power companies appear as plaintiffs and intervenors challenging updated operations benefiting other purposes.
None of this makes the opposition illegitimate, and we do not treat it that way. But a purpose does not hold a permanent veto over the balance among purposes simply because it was there first. Power benefit foregone is a quantifiable and often modest cost that can be analyzed, priced, mitigated, and traded against — not an argument that ends the conversation.
Working through that opposition is a substantial part of what we do: securing recommendations for reallocation over sustained objection from power interests, and defending federal operating decisions against challenges brought by utilities and states together.
The operations stack
The statutes and plans governing federal project operations.
Getting an operating change made — or stopped — starts with putting it in the right place in the hierarchy of operational decisions. Simply accept an answer that an agency lacks statutory authority for your requested change and you spend years seeking an act of Congress that wasn't needed. Ask for a manual update when a deviation would do and you lose years. Accept a deviation when you needed a manual change and you get relief that expires.
Slow · durable · hardest to move
Authorizing legislation
The purposes Congress gave the project, and the outer limit of what any agency can do with it. Where that limit actually sits is a question of interpretation, not a line on a map — and agencies' existing water supply authority is regularly underestimated.
Master manuals & operating guidelines
The basin-wide rules: how storage is allocated among purposes, what triggers drought operations, how shortage is shared.
Project water control plans
The individual reservoir's rules: guide curves, seasonal storage targets, release schedules, channel capacity constraints. Consequential decisions are made here too — a change to a project's plan is incorporated into the master manual.
Deviations & drought operations
Temporary departures from the plan — for a study, a test, an emergency, or a season. Deviations are the fastest route to an operating change, but they are not a substitute for durable changes a project actually needs.
Real-time water management
The daily calls: what the forecast says, what the pool is doing, what gets released tonight. Rarely reviewed by anyone, cumulatively significant, and hard to challenge once a plan is finalized — a season of conservative daily decisions can cost enormous amounts of water.
Fast · discretionary · largely unreviewed
Courts do not re-run the hydrology. Challenges to operating decisions are administrative record cases, and agencies get real deference in balancing authorized purposes. What plaintiffs win on instead is narrower and more procedural: an authority the agency did not actually have, a purpose it failed to consider, an environmental analysis that will not carry the decision, an explanation the record does not support. Which means the outcome is largely determined while the document is being written — years before anyone files.
The threshold question
Before you ask Congress for new authority, find out what the project is already authorized to do.
The received wisdom is that modernizing an old project takes an act of Congress. Frequently it does not. Authorizations from the 1940s rarely enumerate purposes the way a modern report would — the statute adopts the Chief of Engineers' report by reference, and that report speaks in the vocabulary of its own era. Read on its own terms, a project often turns out to be authorized for more than the agency believes.
The Corps concluded that water supply was not an authorized purpose of the project and denied Georgia's request. A district court agreed, and gave metropolitan Atlanta three years to find another source. The Eleventh Circuit read the 1946 authorization and the reports it incorporates on their own terms, and held that water supply is — and always had been — an authorized purpose.
Same documents. Opposite result.
What we handle
From the scoping notice to the appellate argument.
We work on operating decisions from both sides of the record: shaping them while they are being made, and defending or challenging them once they are final. The two are the same practice. You cannot litigate an operations case well without knowing how the document was built — or build one well without knowing how it will be attacked.
Authority and authorized purposes
An opinion on what the project is already authorized to do, built from the authorizing act and the reports it incorporates, read against the policies in force when they were written. It is the cheapest question to answer and the one that determines every other answer.
Manual and guideline updates
Participating in water control manual updates and operating guideline processes — scoping, technical comment, coordination with the district and division, and building a record that supports the operation you need rather than one that merely tolerates it.
Deviations and interim operations
Planned and emergency deviations, pilot operations, and drought contingency measures — including whether a deviation is the right instrument at all, and what it costs you at the next manual update if it is.
Legal authority and environmental review
Agency determinations about statutory authority, environmental impact statements, and biological opinions. Operations decisions survive or fall based on legal conclusions, the sufficiency of environmental review, and the administrative record.
Litigation and negotiated resolution
Administrative Procedure Act challenges to operating decisions and the defense of decisions already made — in district court, on appeal, and in multidistrict proceedings — alongside the basin agreements and mediated settlements that end these disputes when a judgment will not.
Legislative and policy fixes
Some changes genuinely do exceed what an agency can approve. When that is the answer rather than the assumption, we draft and secure the statutory language, and we help shape national policy at the Capitol and before the agency.
Our work in practice
Three basins, three versions of the same question.
How much discretion does a federal agency have to reoperate a project built for something else — and what does it take to make that reoperation stick? We are counsel in all three.
The ACF and ACT basins
- Agency
- U.S. Army Corps of Engineers
- At issue
- Master water control manuals, water supply storage, drought operations
- Our role
- Counsel to the State of Georgia and metropolitan Atlanta water providers
- Status
- Interstate dispute settled; environmental appeal pending in the Eleventh Circuit
The Tri-State Water Wars are the longest-running reservoir operations dispute in the country, and they are the reason much of the modern law in this area exists. We have been in them from the beginning: as counsel to the State of Georgia in Florida v. Georgia, the equitable apportionment action Florida brought against Georgia in the United States Supreme Court, and as counsel to metropolitan Atlanta water providers through litigation in six federal courts — the Eleventh Circuit ruling that water supply is an authorized purpose of Lake Lanier and always was, the reallocations at Lanier and Allatoona, and the defense of both the ACF and ACT master manuals against challenges by a neighboring state, a power company, and environmental groups.
The interstate dispute in the ACF basin is over. In 2026 the Eleventh Circuit dismissed Alabama's appeal following a mediated agreement among the states, the providers, and the Corps, leaving the ACF basin without litigation between the states for the first time since 1989. The basin is not free of litigation, however: an appeal brought by environmental groups remains pending before the Eleventh Circuit, and challenges to Corps operations in the ACT basin continue.
The water control manual was upheld and metro Atlanta's water supply was secured because the legal analysis, environmental record, and explanation of how the Corps balanced competing demands were built to be defended.
Three decades of litigation with Alabama ended with the manuals in force and metro Atlanta's current and future water supply secured.
The Colorado River after 2026
- Agency
- Bureau of Reclamation
- At issue
- Post-2026 operating guidelines for Lake Powell and Lake Mead
- Our role
- Counsel to the State of Utah
- Status
- Final EIS published July 2026; Record of Decision pending
The 2007 Interim Guidelines, the 2019 Drought Contingency Plans, and the arrangements built on them expire at the end of 2026. Reclamation's replacement framework is the largest reoperation decision in the country, and it is arriving without the thing that usually holds such decisions together: agreement among the seven basin states.
Reclamation published its Final Environmental Impact Statement in July 2026. The preferred alternative is not a fixed set of rules but an adaptive framework running through 2036 — operational sideboards within which Reclamation would issue shorter-term operating guidelines, revisited on roughly two-year cycles, with room for consensus agreements to be folded in if the states reach them. It is a structure designed to preserve flexibility, and to preserve the possibility of a deal. We represent the State of Utah in the Colorado River dispute.
Forty million people, and the operating rules for the next decade are being written by an agency that has not been given a consensus to implement.
FIRO at Seven Oaks Dam
- Agency
- USACE Los Angeles District, with local sponsors
- At issue
- Forecast-informed operations on the Santa Ana River
- Our role
- Counsel to San Bernardino Valley Municipal Water District
- Status
- Viability assessment, ahead of deviation and manual update
Seven Oaks Dam is a 550-foot flood risk management project above San Bernardino, built to pass storm flows through, not to hold them. Forecast-Informed Reservoir Operations would change that calculation. With modern atmospheric river forecasting, an operator can hold water that would otherwise be released and let it go later for groundwater recharge — capturing supply the region currently watches leave, without giving up flood protection.
FIRO has already been demonstrated at Lake Mendocino and is being implemented at Prado Dam downstream. The technical work — led by the sponsors with the Corps and the Center for Western Weather and Water Extremes — will show whether forecasts are skillful enough to support the change and the impact, if any, on the flood control purpose. The Corps also needs to decide whether the change can be implemented within its existing authority and under its current water control manual. We represent the San Bernardino Valley Municipal Water District on implementing FIRO at Seven Oaks.
Not every operations challenge ends in litigation. This is a chance to demonstrate FIRO can be implemented and the project reoperated collaboratively.
Operations work also runs alongside our practices in water supply storage reallocation and sponsor-led Section 203 studies — different authorities, frequently the same reservoir.
Who does this work
The lawyers on the call are the ones who argued the cases.
Lewis Jones and John Fortuna have worked federal reservoir operations as a team for two decades, in the basin where much of the modern case law was made — and they have written the scholarship on the authority question that runs through it. That work now runs from the Southeast to the Colorado River and Southern California. As one client told Chambers, “Lewis Jones and John Fortuna are a powerhouse team.”
Lewis B. Jones
Managing Partner
Lewis Jones is an excellent lawyer who always brings sound and sophisticated legal analysis to the table. Client, Chambers and Partners
Lewis advises water utilities on supply, permitting, compliance, and rate setting, and works across the Corps' civil works and regulatory programs as well as with FERC and the Fish and Wildlife Service on reservoir permitting, management, and contracting. He holds a master's degree in ecology alongside his law degree, is a Fellow of the American College of Environmental Lawyers, and is recognized in Chambers USA (Environment).
John L. Fortuna
Managing Partner
John is a great legal mind and a strong advocate with practical insight. Client, Chambers and Partners
John litigates environmental matters in federal and state court and in administrative proceedings, with substantial experience permitting and defending water rights and water supply projects. He also advises clients on complex Corps studies, environmental permitting, and project development. John is recognized in Chambers USA (Environment), Best Lawyers (Environmental Law, Water Law, and Environmental Litigation), and SuperLawyers (Environmental Litigation).
Together
What the partnership has defended.
Reservoir operations matters do not end. They recur every time the manual is reopened, the drought deepens, or a neighbor decides the balance has shifted. The record below is the product of staying with the same basins for twenty years.
- Dismissal of challenges to the ACF and ACT master water control manuals
- Appellate ruling establishing that Lake Lanier was authorized for water supply, vacating an injunction that threatened Metro Atlanta's supply
- The largest storage reallocation in Corps history at Lake Lanier, and the related reallocation at Allatoona
- Dismissal of Alabama's challenges to the Allatoona storage contracts and made-inflow credit
- Reversal of longstanding national Corps policy against crediting return flows and made inflows
- Creation of and continuing support for the National Water Supply Alliance
Lewis and John have also written on the authority question at the center of this practice: Updating Twentieth Century Water Projects to Meet Twenty-First Century Needs: Lessons from the Tri-State Water Wars, 29 Ga. St. U. L. Rev. 959 (2013), with Karen M. Johnston.
They have an outstanding ability to handle the most complex matters involving water law and water supply. They are widely recognized as the ‘best in the business.’ Client, Chambers and Partners
Jeremy M. LaDart
Water Resources Planner & EconomistTwenty-three years at USACE, most recently as Senior Policy Advisor at Headquarters, with work spanning the ACF and ACT basins, the Willamette Basin Review, and the Missouri River mainstem system — the agency side of how operating decisions get made and reviewed. Biography
Common questions
What clients ask first.
Does changing how a project is operated require an act of Congress?
Often not, though that is the usual assumption. An agency has broad discretion to accommodate a project's authorized purposes and considerable latitude to modify a project so long as the change is not so foreign to its original purpose as to be arbitrary. Whether your operation falls on one side of that line or the other is a question of statutory interpretation, and it is worth thinking about carefully before anyone concludes legislation is the only route.
How do you determine a project's authorized purposes?
By reading the authorizing act and the engineering reports it incorporates, in the context of the policies that governed when they were written. Older authorizations do not list purposes in the modern format, and treating that absence as proof a purpose was never authorized is how projects end up understood as narrower than Congress made them. Corps regulations also publish a table of authorized and operating purposes, which is a useful starting point and not the last word.
What is a water control manual, and why does it matter so much?
It is the document that tells operators how to run a federal reservoir: storage targets through the year, release rules, drought triggers, and how the project's authorized purposes are balanced when they conflict. Most manuals were written decades ago and are updated rarely, so an update is often the only realistic opportunity in a generation to change how a project serves your community. When one opens, it is worth treating as a major matter rather than a technical proceeding.
Can operating decisions be challenged in court?
Yes, generally under the Administrative Procedure Act, and often alongside NEPA and Endangered Species Act claims. But these are record review cases, and courts give agencies substantial deference in balancing authorized purposes. Successful challenges usually turn on authority, procedure, or the adequacy of the environmental analysis rather than on a disagreement about how the reservoir should be run.
What is a deviation, and when is it the right tool?
A deviation is a temporary, approved departure from the water control plan — for an emergency, a maintenance need, a test, or a season. It is much faster than a manual update and it is frequently the correct first step, particularly for demonstrating that a new operation is safe. What it is not is a durable solution: it expires, it can be revoked, and relying on one for a permanent need leaves a community's supply resting on a temporary approval.
What is FIRO, and does it require new authority?
Forecast-Informed Reservoir Operations uses modern weather and streamflow forecasting — particularly atmospheric river prediction — to decide whether to retain or release water, rather than relying only on fixed seasonal guide curves. The forecasting question is technical. The legal questions are separate and equally decisive: whether the resulting operation fits the project's authorized purposes, what environmental compliance it needs, how it interacts with water rights and sponsor agreements, and whether it is implemented by deviation or by amending the manual.
How is Reclamation different from the Corps?
Different statutes, different contracting regimes, and a different relationship with the states, particularly in the Colorado River basin, where operations run on compacts, a treaty, and decree obligations layered over federal project authority. The legal architecture differs meaningfully. The practical pattern does not: an agency exercising discretion over an existing project, an environmental record supporting it, and parties positioned to challenge it.
We are one user among many. Is it worth engaging in a basin-wide process?
Usually yes, and earlier than feels necessary. Basin-wide operating documents are built from the technical assumptions and demand figures that go in during scoping. A provider absent from that stage typically finds its needs represented by someone else's numbers, and correcting the record after a draft is published is far harder than shaping it before.
When should we bring in counsel?
When the process opens, not when the decision issues. By the time a Record of Decision is signed, the record is closed and your options have narrowed to litigation. The clients who do best treat a manual update or guideline process the way they would treat a permit for a major project.
Start the conversation
Tell us which project is being reoperated, and what it costs you.
Whether a manual update has just been announced, a deviation request is being prepared, a decision has issued that you need reviewed, or you are weighing whether to litigate at all, a short call will tell you where you stand.
