Skip to content
Jeremy M. LaDart

Our Team

Jeremy M. LaDart

Senior Water Resources Planner & Economist

“Jeremy’s knowledge of USACE policies and practices, and his expertise in Civil Works planning and economic analysis, are unsurpassed. You can always count on him to exceed expectations.”Senior Corps Official

Mobile251-391-7824

Jeremy LaDart is a Senior Water Resources Planner and Economist. With over 23 years at the U.S. Army Corps of Engineers (USACE), Jeremy brings deep knowledge of the processes and policies governing the development, justification and funding of federal water resource projects, offering clients invaluable insight into project reviews and execution at the district, Headquarters, and Assistant Secretary of the Army levels.

Over his career, Jeremy played an integral role in recommending to Congress over 40 USACE Chief’s Reports and Director’s Reports valued at over $12 billion, covering navigation, flood and coastal storm risk management, ecosystem restoration, and water supply.

Most recently, Jeremy served as Senior Policy Advisor at USACE Headquarters, overseeing development of Water Resources Development Act Policy and leading planning for Section 203 studies by non-federal sponsors. Before that, he served as the Mobile District’s Chief of the Planning and Environmental Division, where he directed a more than $120 million annual program and oversaw a 60-member team responsible for all planning and NEPA actions, including design, construction, and operations and maintenance studies.

Representative experience

Selected work.

Private Practice

Since joining Jones Fortuna, Jeremy has advised clients navigating the complexities of USACE authorization and appropriation processes, policy and legal requirements, and project justification. Representative matters include:

  • Advising a water district on next steps to minimize schedule and execution impacts for design and construction following a Section 902 (WRDA 1986) cost bust requiring Congressional reauthorization.
  • Managing a non-federal sponsor’s comprehensive benefits assessment for a large flood risk management project, maximizing the full range of benefits considered under the Civil Works program — National Economic Development (NED), Regional Economic Development (RED), Environmental Quality (EQ), and Other Social Effects (OSE).
  • Overseeing a non-federal sponsor’s economic analysis of hydropower benefits foregone in connection with a water supply reallocation study, ensuring both appropriate and consistent analysis of potential effects on the hydropower purpose and storage-pricing considerations.
  • Advising a port client on the Section 408 process (modification of a federal project) and related permitting requirements.

U.S. Army Corps of Engineers

Jeremy’s work at USACE spanned the full water resources project lifecycle, from planning and policy through design, construction, and ongoing operations and maintenance. He is a nationally recognized economics, planning, and policy expert. Highlights include:

  • National planning and policy lead for non-federal sponsor led decision documents under Section 203 (studies by non-federal sponsors) and Section 204 (work by non-federal sponsors).
  • Co-led the USACE Economics Sub-Community of Practice. Advised, advising and directing a community of 180 economists in technical and policy application of economic analysis, comprehensive benefits assessments, tradeoff analyses, and Risk Informed Decision Making.
  • Chief of Planning and Environmental Division, Mobile District, responsible for the district’s full planning mission, including plan formulation, conservation and development of water and land resources, economic and environmental issues, policy matters, and flood plain management services.

Example Projects Successfully Achieving Congressional Authorization or Administrative Approval

  • Section 203 of WRDA 1986 – Studies by Non-Federal Sponsors: Canaveral Harbor, Navigation Study, Brevard County, Florida; Fort Pierce Beach, St. Lucie County, Florida; Port Fourchon Belle Pass Channel, Louisiana; Wilmington Harbor, North Carolina.
  • Federal Water Supply Reallocation Studies and Agreements: Apalachicola-Chattahoochee-Flint (ACF) and Alabama-Coosa-Tallapoosa (ACT) Water Control Manual Update Alabama, Florida, Georgia; Willamette Basin Review, Water Supply Reallocation Study, Oregon; Missouri River Mainstem Reservoirs, Surplus Water Report and Agreements; Garrison Dam/Lake Sakakawea Surplus Water Report; DeGray Lake M&I Water Supply for Central Arkansas Water and the City of Hot Springs.
  • Federal Flood & Coastal Storm Risk Management: Truckee Meadows, Nevada; American Rivers Common Features, California; West Shore Lake Pontchartrain, Louisiana; East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Reformulation, New York; Fire Island to Montauk Point, Reformulation, New York; Selma, Alabama, Flood Risk Management and Bank Stabilization; Okaloosa County, Florida, Coastal Storm Risk Management.

Federal Ecosystem Restoration Studies

  • Delta Islands and Levees Feasibility Report, California
  • Neuse River Basin, Ecosystem Restoration Project, North Carolina
  • Lynnhaven Ecosystem Restoration Project, Virginia
  • Skokomish River Basin Ecosystem Restoration, Washington
  • Puget Sound Nearshore Ecosystem Restoration, Washington

More about Jeremy

Education

  • Bachelors, Business Administration and Economics, University of South Alabama, 2003

Honors

  • Department of the Army: Civilian Service Medal 2024 – Leadership and Outstanding Execution of the Mobile District Planning Program
  • Department of the Army: National Planning Achievement Enterprise Award 2012 – The SMART Planning Implementation Team

USACE Accreditations

  • Planning Associates Graduate (2009)
  • Water Resources Certified Planner

Talk with Jeremy about a Corps study, policy, or justification question.

Prior results do not guarantee a similar outcome. Contacting Jones Fortuna LP does not create an attorney-client relationship.
Back To Top