Section 203 · Water Resources Development Act of 1986

Your study is funded locally. It is judged federally.

Under Section 203, a non-federal sponsor can pay for and lead its own Corps-quality feasibility study instead of waiting in the General Investigations queue. The engineering is the part you can control. The federal decides whether any of it counts. We help ensure that review is a success.

Why sponsors are looking at 203

Federal study dollars are scarce. Local need is not.

Districts are triaging their General Investigations portfolios — narrowing scopes, deferring starts, and in some cases closing studies that communities have waited years for. Meanwhile water demands continue to grow, flooding continues to impact communities, and infrastructure needs go unmet.

Section 203 puts the pen in your hands. A water district, port authority, levee board, county, or state agency can advance the feasibility study with its own funds, on its own timeline, and then submit the completed report to the Secretary of the Army for review and transmittal to Congress.

It is a real path forward. It is also a path on which the sponsor carries the schedule risk, the cost risk, and — critically — the policy risk.

A Section 203 study is the only feasibility pathway where a sponsor can spend years and millions, do genuinely excellent technical work, and still arrive at a report the Corps cannot recommend.

The pathway

Everything before the federal review is your money. Everything after it is their decision.

The stages below are simplified, but the line down the middle is not. A Section 203 study is developed at non-federal expense and then evaluated against federal law, Corps policy, and the standards applied to every federally led report. Sponsors who plan backward from that federal review tend to clear it.

Stage 01

Pathway decision

Is 203 the right instrument at all — or is this a 408, a reallocation, a CAP project, or a reauthorization problem wearing a study costume?

Stage 02

Scoping & coordination

Notice of intent, engagement with the district and division, agreements, and an early read from the Corps on scope and assumptions.

Stage 03

Study execution

Plan formulation, H&H, NEPA, and the economics — built to Corps standards from the first day rather than retrofitted at the end.

Stage 04

Secretary's review

The report is tested for compliance with federal law and Corps policy, and for whether the recommended plan is justified and supportable.

Stage 05

Congress & funding

Transmittal, authorization in a WRDA, appropriations, and the cost and scope discipline that follows a project into construction.

Studies rarely fail on engineering. They fail on a benefit stream the Corps cannot accept, an alternatives analysis that skipped a plan the policy requires, a NEPA record that will not survive, a cost share or real estate assumption that was never going to work, or a recommendation that quietly exceeds what the Secretary can support. Each of those is knowable in year one.

How we help

We are the sponsor's counsel and policy advisor, not another engineering bid.

Your engineers build the study. We make sure the study you are building is the one the federal government can say yes to — and we stay with it through authorization and the years that follow.

Before you commit

Pathway & feasibility assessment

An honest read on whether Section 203 serves your objective, what it will realistically cost and take, and what the alternatives are. Sometimes the answer is that a different authority gets you there faster.

Agreements

Legal framework & negotiation

The agreements, notices, cost-share terms, credit and reimbursement questions, and real estate commitments that govern the study and the project that follows.

The usual failure point

Benefits & economic justification

Building a defensible NED analysis, and capturing the full range of benefits the Civil Works program allows — regional economic development, environmental quality, and other social effects — in the form the Corps actually evaluates.

Policy

Compliance & review readiness

Testing the emerging report against Corps policy and the exceptions process while there is still time to change course, rather than discovering the problem in review.

After the report

Authorization strategy

Positioning the recommendation for transmittal and for a Water Resources Development Act, and coordinating with the delegation, the Administration, and other sponsors moving on the same timeline.

Long game

Post-authorization risk

Section 902 cost limits, project modifications under Section 408, permitting, and appropriations — the issues that surface after everyone else has moved on.

Jeremy M. LaDart

The person on the other side of the desk

Jeremy M. LaDart

Senior Water Resources Planner & Economist · Jones Fortuna LLC

Jeremy's knowledge of USACE policies and practices, and his expertise in Civil Works planning and economic analysis, are unsurpassed. You can always count on him to exceed expectations. Senior Corps Official

Before joining Jones Fortuna, Jeremy spent 23 years at the U.S. Army Corps of Engineers. Most recently he served as Senior Policy Advisor at USACE Headquarters, where he oversaw development of Water Resources Development Act policy and led planning for Section 203 studies by non-federal sponsors — the national policy lead for the very pathway your study will travel.

Jeremy knows what Headquarters and the Assistant Secretary's office look for when a sponsor-led report arrives for review, because he made the final recommendation to the decisionmaker.

23years at USACE, district through Headquarters
40+Chief's and Director's Reports recommended to Congress
$12Bin recommended federal water resources projects
  • National planning and policy lead for non-federal sponsor–led decision documents under Section 203 and Section 204
  • Co-led the USACE Economics Sub-Community of Practice, directing 180 economists on economic analysis, comprehensive benefits, and risk-informed decision making
  • Chief, Planning and Environmental Division, Mobile District — a $120M+ annual program and a 60-person team covering all planning and NEPA actions
  • Planning Associates graduate; Water Resources Certified Planner; Department of the Army Civilian Service Medal, 2024
Full biography

Section 203 track record

Studies that reached the finish line.

Sponsor-led studies Jeremy worked on at the Corps that achieved congressional authorization or administrative approval.

Canaveral Harbor Navigation Study

Deep-draft navigation improvements for a harbor balancing commercial, cruise, and defense uses.

Brevard County, FL

Fort Pierce Beach

Coastal storm risk management on a shoreline with a long federal history and an active sponsor.

St. Lucie County, FL

Port Fourchon, Belle Pass Channel

Channel deepening serving a port central to Gulf energy logistics.

Louisiana

Wilmington Harbor

Navigation improvements advanced by the sponsor under Section 203.

North Carolina

Beyond Section 203, Jeremy's portfolio spans water supply reallocation across the ACF and ACT basins, the Willamette Basin Review, and the Missouri River mainstem system; flood and coastal storm risk management from Truckee Meadows to Jamaica Bay; and ecosystem restoration from the Sacramento–San Joaquin Delta to Puget Sound.

Working with your engineer

We do not compete with your design team. We make their work count.

Most sponsors come to Section 203 with an engineering firm already selected, or select one early. That is the right sequence. Our role sits alongside it.

For sponsors

You get independent counsel on the federal side of the study — policy, agreements, economics, and authorization — that is not tied to the scope of the engineering contract.

For engineering partners

Your team gets an early, authoritative read on what the Corps will accept, so technical effort goes into analyses that will hold up rather than into rework after review comments land.

For the schedule

Policy problems caught in scoping cost weeks. The same problems caught in review cost study cycles — and sometimes the study.

Common questions

What sponsors ask first.

What is a Section 203 study?

Section 203 of the Water Resources Development Act of 1986 allows a non-federal interest to undertake a feasibility study of a proposed water resources project at its own expense and submit the completed report to the Secretary of the Army. The Secretary reviews it for compliance with federal law and policy before transmitting it to Congress with recommendations. In practice, it lets a sponsor move without waiting for a federal study appropriation.

Does a Section 203 report get treated differently than a federally led study?

The report has to meet the same standards. That is the point sponsors most often underestimate: leading the study gives you control over schedule and scope, not relief from Corps planning policy, NEPA, or the economic justification requirements that apply to any recommended federal project.

Can the Corps be involved while we lead the study?

Yes, and the sponsors who do best treat district and Headquarters engagement as continuous rather than as a submission event at the end. The right level and form of Corps involvement depends on your project and current agency practice, which is one of the first things worth pinning down.

Does completing a study guarantee authorization or funding?

No. A completed and accepted report positions a project for authorization in a future WRDA and for subsequent appropriations, but those remain congressional decisions. Building the record and the relationships that support those decisions is part of the work, not an afterthought.

When should we bring in counsel?

Before the pathway decision, ideally. The most expensive Section 203 conversations we have are the ones that start after a draft report has been submitted.

Start the conversation

Bring us the question you have not been able to get a straight answer to.

Whether you are weighing Section 203 against another authority, midway through a study and worried about a policy exposure, or preparing for review, a short call is usually enough to tell you where you stand.

This page describes general information about Section 203 of the Water Resources Development Act of 1986 and is not legal advice. Federal water resources law, Corps policy, and agency practice change; the application of any authority depends on the specific facts of a project. Contacting Jones Fortuna LLC does not create an attorney-client relationship.